The Northeast Corridor is about one mile long, and will feature both combined and separated trail paths with the same trail design, benches, bike racks, lighting and signage as the rest of the Cultural Trail.
It is anticipated that the Northeast Corridor hardscape will be complete by late 2009, with plantings installed in spring 2010.
No comments:
Post a Comment